A company has added a second control enclosure to an IBM Storwize V7000 to provide more storage for several servers. What must be done to the host systems before mapping volumes from the new I/O group?
A. Ensure the host zoning is in place for the new I/O group
B. Double the queue depth on each volume
C. Verify host mirroring is in place for the volumes
D. Install additional HBAs for connectivity to the new I/O group
Answer: A
A customer is deploying an IBM Storwize V7000 and wants to grow the system to 32 PB of addressable space. Which extent size is needed to meet this requirement?
A. 8192 MB
B. 4096 MB
C. 2048 MB
D. 1024 MB
Answer: A
No comments:
Post a Comment
Note: only a member of this blog may post a comment.